Today we painted a calendar on the wall of the small bedroom, and did a couple more changes, according to what we had in the 3D visualizations. Here is how it looks:
Sunday, 6 October 2013
Monday, 30 September 2013
Wednesday, 18 September 2013
Changes to the small bedroom
Like we mentioned in the end of the previous post, we decided to change the organization of the small bedroom/office to make it more spacious. So we prepared some visualizations of how it should look like.
Tuesday, 3 September 2013
Showing what's new
Lately we have been making posts about updates in specific rooms, time to make a more general tour, because there are a couple of things to show:
The main bedroom is done - we have the dressing table, the sliding door to the walk in closet, the skirting boards around the walls, and some decorations!
The second room has changed a bit, and it's still not ready yet! But we did change it's organization to make it a bit more spacious and comfortable. We'd still like to make the bed structure from wooden pallets, and have some shelves on the wall for books.
Next to the entrance we received this huge 170x290cm mirror, which took 8 people to lift up through the balcony, it was so heavy!!! Fortunately nothing broke, and now with this addition to the wardrobe doors, it makes a fully mirrored wall.
And we also have some really nice gifts from friends who came to visit - a wine jar and a ceramic vase that looks like a crinkled paper bag! And we also bought something by ourselves - a white water heater at DUKA.
Friday, 23 August 2013
Kitchen Update!
After another delivery of some missing pieces, the kitchen is now almost complete!
We have a white glass covering the wall behind the kitchen sink.
A cover for the induction plate in the same Corian material as the rest of the island.
And the main delivery - the huge LED lamp over the island!
Only some very small details left. Some more updates soon!
Friday, 16 August 2013
Cork wall
From the beginning we had the idea of having a wall in the corridor completely covered in cork, where we would be able to stick photographs, postcards and various other things from vacations and other events. And here is how it went:
The cork tiles (almost 50 in total!)
We had to cut one of the tiles carefully around a light switch...
And done! Now all we need are the pictures! We'll update this post once we have them.
For a bonus we have a great drawing that Natalia did in the chalkboard paint wall:
Leeloo's weekly calendar! Busy, busy...
Sunday, 11 August 2013
Warm days in the balcony!
The weather has been excellent lately, so it's the perfect occasion to decorate our balcony with some flowers!
Here are all the things prepared (special thank you to a very helpful lady in Leroy Merlin who helps us choose all these things!)
Leeloo approves.
We found these vases that fit perfectly into the shape of the railing!
It brings a little bit of color to our mostly black and white decoration!
Sunday, 4 August 2013
Black bathroom update!
After months of waiting, we finally received the missing parts to the bathroom! The sink and the mirrors arrived, were installed, and here's what they look like:
Here is the sink, with all the cool details...
... a "hidden" recess to place shower products, invisible unless you're in the bathtub...
... two slots to hang the towel...
... and the ramp shaped sink!
We also have the mirrors on both sides!
Although of course, having two mirrors facing each other often produces some crazy results!
And Leeloo seems to approve.
More updates soon!
Subscribe to:
Posts (Atom)


















































